Tiles Fixing Guideline |
|
The surface to be paved to be flat, and free from substance: Dust, impermeable products, soluble salts, and all those products which are incompatible with adhesive material. In case of crumbling of the base, it must be removed till getting firm surface.
Prior To Installation |
|
|
|
|
|
Spending on the surface using a dentate trowel, whose size will very from 6x6mm. to 9x9mm. depending on the size and manufacturer’s instructions.
Laying |
|
|
|
|
|
Hit the tile with a rubber hammer (from the center to the edges of the tiles). In order to distribute and level the tile.
Leveling |
|
|
|
|
|
Tiles must be paved leaving a gap between them which will vary from 1 mm. To 3 mm. Joint for placing them
Spacing |
|
|
|
|
|
Joining has to be carried out using a rubber palette knife, which will be used to compress material with backwards and forwards movements. In this way. Joint will be field to over-flowing. Anyhow please follow the manufacturer’s introduction in how to use the product-drying time, removing leftovers, and cleaning.
Joining |
|
|
|
|
|
Once the work has been finished. There are leftovers of the employed materials which have to be removed as soon as possible (cement, joints material, ets…). For this, we recommended using a cement remover of any other acid based descaling product.
After Laying |
|
|
|
|
|
|
|